diff options
Diffstat (limited to 'plugins/code-modernization/commands/modernize-brief.md')
| -rw-r--r-- | plugins/code-modernization/commands/modernize-brief.md | 277 |
1 files changed, 119 insertions, 158 deletions
diff --git a/plugins/code-modernization/commands/modernize-brief.md b/plugins/code-modernization/commands/modernize-brief.md index 1871ce17..fb9a8f76 100644 --- a/plugins/code-modernization/commands/modernize-brief.md +++ b/plugins/code-modernization/commands/modernize-brief.md @@ -1,170 +1,131 @@ --- -description: Generate a phased Modernization Brief — the approved plan that transformation agents will execute against -argument-hint: <system-dir> [target-stack] +description: Write the phased Modernization Brief — the plan a steering committee approves and the build commands execute against +argument-hint: <system> [target-stack] +arguments: system target_stack --- -Synthesize everything in `analysis/$1/` into a **Modernization Brief** — the -single document a steering committee approves and engineering executes. - -Target stack: `$2` (if blank, recommend one based on the assessment findings). - -Read `analysis/$1/ASSESSMENT.md`, `analysis/$1/topology.json` (plus the -`.mmd` files alongside it — do NOT read `TOPOLOGY.html`, it's an -interactive viewer with the data minified inside), and -`analysis/$1/BUSINESS_RULES.md` first. If any are missing, say so and -stop — they come from `/modernize-assess`, `/modernize-map`, and -`/modernize-extract-rules` respectively. Run those first. - -Two more inputs are conditional: - -- **`analysis/$1/PREFLIGHT.md`** — read it if it exists. It records two - things nothing else has: the human's answers to `/modernize-preflight` - Check 0 (scope, whether they can build and run tests locally and how - long CI takes, bespoke build infrastructure, prior attempts, what is - off-limits) and the Check 6 **scope boundary** — whether `legacy/$1` is - a slice of a larger codebase, and what *outside* it depends on code - *inside* it. Both constrain this plan more than anything derivable from - the source. Never override an answer the human gave there with a guess. -- **`analysis/$1/DELTA_CATALOG.md`** — **required** whenever the target - (`$2`, or your recommendation) is a newer version of the *same* stack. - A same-stack uplift's phase order is decided by its version deltas, not - by the topology alone — most of all by whether the **existing test suite - can even execute on the target runtime**. Phasing an uplift without the - catalog is planning blind; it is exactly how a test-framework migration - ends up scheduled last when it must come first. If the catalog is - missing, produce it *before* phasing — run `/modernize-uplift $1 - <source> $2` through its Step 3 (the delta-catalog step), or spawn the - **version-delta-analyst** agent directly — then return here. Do not - guess at the deltas. - -**Staleness check:** compare modification times. If any input is newer -than an existing `MODERNIZATION_BRIEF.md`, the brief is being justifiably -regenerated; but if an existing brief is newer than all inputs and the -user re-ran this command anyway, ask what changed. Either way, note the -input timestamps in the brief's header so reviewers can see what it was -built from. +Synthesize everything in `analysis/$system/` into a **Modernization Brief**: the single +document a steering committee approves and engineering executes. Target stack: +`$target_stack` (if blank, the one in `analysis/$system/INTENT.md`, else recommend one from the assessment). + +Read `ASSESSMENT.md`, `topology.json` (and the `.mmd` files beside it; never read +`TOPOLOGY.html`, it is a viewer with the data minified inside) in `analysis/$system/` first, +and `BUSINESS_RULES.md` too unless this is a same-technology **uplift** (the intent or the assessment +says so): an uplift keeps the code, so its Behavior Contract is the recorded baseline and `extract-rules` +can wait. If a required file is missing, say so and stop: they come from `assess`, `map` and +`extract-rules`, which run first. Four more inputs are conditional: + +- **`RULE_REVIEWS.json` / `RULE_REVIEWS.md`**, if they exist (written by `/code-modernization:modernize-review`): + a person's verdicts on individual rules. Never put a rule marked `wrong` or `discuss` in the Behavior + Contract as settled behavior: list each in section 7 as an open question with the reviewer's note, and + block the phase that covers its module on it. A `confirmed` rule counts as confirmed by a person. +- **`INTENT.md`**, if it exists (written by `/code-modernization:modernize`): what the person wants (goal, target, + what must stay true). It is the objective of this plan; never override it with a guess. Its goal decides each + phase's build command: a newer version of the same technology means `uplift`, a rewrite in another technology + means `transform`, a rebuild on a new architecture means `reimagine`. Without it, the assessment's pattern decides. +- **`PREFLIGHT.md`**, if it exists. It holds two things nothing else has: the human's answers + to preflight Check 0 (scope, local build and test, bespoke build infrastructure, prior + attempts, what is off limits) and the Check 6 **scope boundary** (whether the source is a + slice of a larger codebase, and what outside it depends on code inside it). Both constrain + this plan more than anything derivable from the source. Never override a human's answer with + a guess. +- **`DELTA_CATALOG.md`**, **required** when the target is a newer version of the *same* stack. + An uplift's phase order is decided by its version deltas, above all by whether the existing + tests can even run on the target runtime; phasing without the catalog is planning blind. If it + is missing, produce it first (`/code-modernization:modernize-uplift $system <source> $target_stack` + through its delta-catalog step, or the **version-delta-analyst** agent) and **wait for its result**: + never end your turn while an agent is still running, and never write the brief before the catalog + exists. Do not guess at deltas. + +**Staleness.** If an input is newer than an existing `MODERNIZATION_BRIEF.md`, regenerating is +justified. If the brief is newer than every input and the user re-ran this anyway, ask what +changed. Note the input timestamps in the brief's header. ## The Brief -Write `analysis/$1/MODERNIZATION_BRIEF.md`: - -### 1. Objective -One paragraph: from what, to what, why now. - -### 2. Target Architecture -Mermaid C4 Container diagram of the *end state*. Name every service, data -store, and integration. Below it, a table mapping legacy component → target -component(s). - -### 3. Phased Sequence -Break the work into 3-6 phases. Order by **strangler-fig** for a cross-stack -rewrite (lowest-risk, fewest-dependencies first), or **build-graph leaf-first** -for a same-stack uplift (libraries before the apps that depend on them). - -For an **uplift**, leaf-first has three overrides, and getting them wrong is -the most common way an uplift plan fails. Apply them *here*, at planning -time. `/modernize-uplift` Step 1 re-applies the same rules at execution -time (its list also names multi-targeting — the *technique* that satisfies -override 3's first option), and an approved order and a re-derived one must -never disagree — which is exactly what deciding the order without these -would produce: - -1. **The test harness is not a leaf — it is a prerequisite.** Nothing - migrated can be validated until the tests that validate it run on the - target. If `DELTA_CATALOG.md` shows the test framework or its runner - does not support the target runtime (NUnit 2 or MSTest v1 on modern - .NET, JUnit 4 without the vintage engine, `nose` on Python 3, …), then - migrating the test framework is **Phase 1 by itself**, before any - production code moves. -2. **Dependency deltas that every consumer shares force a coordinated - cut** (a major-version bump of an ORM, a namespace move like - `javax`→`jakarta`). These cannot be done leaf-first incrementally — - every consumer changes together — so they get their own cross-cutting - phase. -3. **Shared nodes with consumers *outside* the scope** (PREFLIGHT.md's - scope-boundary check) need an explicit, recorded decision in whichever - phase touches them: keep them buildable for both old and new consumers - through the transition (multi-targeting, publishing for both versions, - a parallel artifact), expand the scope to include the consumers, or - accept and schedule the break. Never silently migrate a shared node in - place and break every consumer nobody was looking at. - -Name the per-phase execution command: `/modernize-transform` (cross-stack -module rewrite), `/modernize-reimagine` (greenfield rebuild), or -`/modernize-uplift` (same-stack version bump — when the target is a newer -version of the *same* stack, this is the path, not transform). For each phase: -- Scope (which legacy modules, which target services) -- Entry criteria (what must be true to start) -- Exit criteria (what tests/metrics prove it's done) -- Relative scale (T-shirt size — S/M/L/XL — anchored to the phase's share - of the assessment's COCOMO complexity index. This ranks phases by size - against each other; it is **not** a duration. Do **not** state - person-months, weeks, calendar dates, or a delivery estimate — agentic - transformation does not follow the human-team productivity curves those - units assume, so any time figure here would be misleading.) -- Risk level + top 2 risks + mitigation - -The named execution command **reads this brief** and treats its phase's -scope, entry criteria, and exit criteria as binding gates. So write entry -criteria as *checkable preconditions* ("baseline recorded in -`analysis/$1/BASELINE.md`", "pilot playbook approved"), not aspirations — -and tell the approver they steer execution by editing this file. An edited -entry criterion is honored; a note in a chat is not. - -Render the phases as a Mermaid `flowchart LR` showing **sequence and -dependencies** (Phase 1 → Phase 2 → …, with branches where phases are -independent). Do **not** use a `gantt` chart — gantt encodes calendar -durations, and this plan deliberately makes no time claims. - -**Phase 1 is a pilot, and this brief is a hypothesis.** Whenever a phase's -units share one execution recipe (an uplift over many projects, a transform -over many similar modules), name **one representative unit** as that -phase's own first slice. For an uplift, `/modernize-uplift` Step 5a -*enforces* this — it will not fan out without a pilot and its playbook; for -the other execution commands the pilot lives here, written into that -phase's **entry criteria**, which they read as a gate. A reviewer should -see it in this document either way. Say explicitly in §3 that what the pilot -surfaces (a delta the analysis missed, a prerequisite that reorders the -phases, an environment fact nobody wrote down) is *expected* to revise -this brief, and that a regenerated brief after the pilot is the normal -path, not a correction. Legacy systems hide their surprises in the build -and the runtime, not in the source; no amount of reading substitutes for -one unit taken all the way through. - -### 4. Business Walkthroughs -For each persona flow in `analysis/$1/topology.json` (`flows` — produced -by `/modernize-map`), a short narrative table: persona, what happens in -business language, which legacy modules implement it today, and which -phase from §3 replaces each. This is the section non-technical approvers -actually read — it connects "Phase 2" to "what happens when a customer -files a claim". If topology.json has no flows, derive 2–3 walkthroughs -from the entry points and say they need SME confirmation. - -### 5. Behavior Contract -List the **P0 rules** from BUSINESS_RULES.md (the ones tagged `Priority: P0` — -money, regulatory, data integrity) that MUST be proven equivalent before any -phase ships. These become the regression suite. Flag any P0 rule with -Confidence < High as a blocker requiring SME confirmation before its phase -starts. - -### 6. Validation Strategy -State which combination applies: characterization tests, contract tests, -parallel-run / dual-execution diff, property-based tests, manual UAT. -Justify per phase. - -### 7. Open Questions -Anything requiring human/SME decision before Phase 1 starts. Each as a -checkbox the approver must tick. - -### 8. Approval Block +Write `analysis/$system/MODERNIZATION_BRIEF.md` with these sections. + +**1. Objective.** One paragraph: from what, to what, why now. + +**2. Target Architecture.** A Mermaid C4 Container diagram of the end state naming every service, +data store and integration, then a table mapping each legacy component to its target component(s). + +**3. Phased Sequence.** 3–6 phases, ordered by **strangler fig** for a cross-stack rewrite +(lowest risk and fewest dependencies first) or **build-graph leaf-first** for an uplift +(libraries before the apps that use them). For an uplift, three overrides decide whether the +plan works; the uplift command re-applies them at execution, and the two must never disagree: + +1. **The test harness is a prerequisite, not a leaf.** If the catalog shows the test framework or + runner does not support the target (NUnit 2 or MSTest v1 on modern .NET, JUnit 4 without the + vintage engine, `nose` on Python 3), migrating it is **Phase 1 by itself**. +2. **A dependency delta every consumer shares forces a coordinated cut** (an ORM major version, + `javax` to `jakarta`): it gets its own cross-cutting phase, not an incremental leaf-first one. +3. **A shared node with consumers outside the scope** (from the preflight boundary check) needs an + explicit decision in the phase that touches it: keep it buildable for old and new consumers + (multi-targeting, publishing both), widen the scope to include the consumers, or schedule the + break. Never silently migrate it in place. + +Write every phase in this exact shape, because the build commands and the progress pane read it: + +``` +#### Phase N — <name> +Command: /code-modernization:modernize-transform | -uplift | -reimagine (exactly one) +Modules: <module ids exactly as in topology.json, comma separated> +Scale: S | M | L | XL +Risk: <level>; <top 2 risks and mitigations> +Entry criteria: +- [ ] <a condition that can be checked> +Exit criteria: +- [ ] <a condition that can be checked> +``` + +- `transform` is a cross-stack module rewrite, `reimagine` a greenfield rebuild, and `uplift` a + same-stack version bump (when the target is a newer version of the same stack, it is the path, not + `transform`). +- **Scale** is a T-shirt size anchored to the phase's share of the assessment's complexity index. It + ranks phases against each other and is **not** a duration: state no person-months, weeks, dates or + delivery estimate (agentic work does not follow human-team productivity). +- **Criteria are conditions, never states.** "All P0 rules in Phase 1 proven equivalent" is a + criterion; "P0 rules proven" is a claim. Make entry criteria *checkable preconditions* ("baseline + recorded in `analysis/$system/BASELINE.md`", "pilot playbook approved"). The build commands read the + brief and treat them as binding, and they may tick a box or add a note but never reword a criterion: + a proposed change goes on a `Proposed revision:` line for the approver. Tell the approver they steer + execution by editing this file: an edited criterion is honored, a chat message is not. +- Draw the phases as a Mermaid `flowchart LR` of **sequence and dependencies**, never a `gantt` + (that encodes durations this plan deliberately does not claim). +- **Phase 1 is a pilot, and this brief is a hypothesis.** When a phase's units share one recipe (an + uplift over many projects, a transform over many similar modules), name one representative unit as + its first slice in the entry criteria. Say in §3 that what the pilot surfaces (a delta the analysis + missed, a prerequisite that reorders the phases, an environment fact nobody wrote down) is *expected* + to revise the brief, and that regenerating it after the pilot is the normal path. Legacy systems hide + their surprises in the build and the runtime, not the source. + +**4. Business Walkthroughs.** For each persona flow in `topology.json` (`flows`), a short table: +persona, what happens in business language, which legacy modules implement it, and which phase +replaces each. This is the section non-technical approvers read. With no flows, derive 2–3 from the +entry points and mark them as needing SME confirmation. + +**5. Behavior Contract.** The **P0 rules** from `BUSINESS_RULES.md` (the ones the system's core purpose +depends on, or that are costly if wrong) that MUST be proven equivalent before any phase ships: they become the regression suite. +Flag any P0 rule below High confidence as a blocker needing SME confirmation before its phase starts. For an uplift +with no rules file, the contract is the baseline: `analysis/$system/BASELINE.md` and the result files it points to, +which the new version must reproduce. + +**6. Validation Strategy.** Which combination applies, per phase: characterization tests, contract +tests, dual-execution diff, property-based tests, manual UAT. + +**7. Open Questions.** Everything needing a human decision before Phase 1, each a checkbox the +approver ticks. + +**8. Approval Block** + ``` Approved by: ________________ Date: __________ Approval covers: Phase 1 only | Full plan ``` -## Present +## Finish -Present a summary of the brief and **stop — write nothing further until -the user explicitly approves** (use plan mode if the session supports -it). This gate is the human-in-the-loop control point; "no objection" is -not approval. +Refresh the report: `python3 "${CLAUDE_PLUGIN_ROOT}/scripts/build_report.py" $system` (a convenience: if it fails or `python3` is missing, say so in one line and carry on). Present a summary of the brief and **stop: write nothing further until the user +explicitly approves** (use plan mode if the session supports it). This is the human control point, and +"no objection" is not approval. After approval, the next step is Phase 1's command. |
