diff options
Diffstat (limited to 'plugins/code-modernization/commands')
6 files changed, 438 insertions, 36 deletions
diff --git a/plugins/code-modernization/commands/modernize-brief.md b/plugins/code-modernization/commands/modernize-brief.md index 53e4bb3d..1871ce17 100644 --- a/plugins/code-modernization/commands/modernize-brief.md +++ b/plugins/code-modernization/commands/modernize-brief.md @@ -15,6 +15,28 @@ interactive viewer with the data minified inside), and stop — they come from `/modernize-assess`, `/modernize-map`, and `/modernize-extract-rules` respectively. Run those first. +Two more inputs are conditional: + +- **`analysis/$1/PREFLIGHT.md`** — read it if it exists. It records two + things nothing else has: the human's answers to `/modernize-preflight` + Check 0 (scope, whether they can build and run tests locally and how + long CI takes, bespoke build infrastructure, prior attempts, what is + off-limits) and the Check 6 **scope boundary** — whether `legacy/$1` is + a slice of a larger codebase, and what *outside* it depends on code + *inside* it. Both constrain this plan more than anything derivable from + the source. Never override an answer the human gave there with a guess. +- **`analysis/$1/DELTA_CATALOG.md`** — **required** whenever the target + (`$2`, or your recommendation) is a newer version of the *same* stack. + A same-stack uplift's phase order is decided by its version deltas, not + by the topology alone — most of all by whether the **existing test suite + can even execute on the target runtime**. Phasing an uplift without the + catalog is planning blind; it is exactly how a test-framework migration + ends up scheduled last when it must come first. If the catalog is + missing, produce it *before* phasing — run `/modernize-uplift $1 + <source> $2` through its Step 3 (the delta-catalog step), or spawn the + **version-delta-analyst** agent directly — then return here. Do not + guess at the deltas. + **Staleness check:** compare modification times. If any input is newer than an existing `MODERNIZATION_BRIEF.md`, the brief is being justifiably regenerated; but if an existing brief is newer than all inputs and the @@ -37,11 +59,40 @@ component(s). ### 3. Phased Sequence Break the work into 3-6 phases. Order by **strangler-fig** for a cross-stack rewrite (lowest-risk, fewest-dependencies first), or **build-graph leaf-first** -for a same-stack uplift (libraries before the apps that depend on them). Name -the per-phase execution command: `/modernize-transform` (cross-stack module -rewrite), `/modernize-reimagine` (greenfield rebuild), or `/modernize-uplift` -(same-stack version bump — when the target is a newer version of the *same* -stack, this is the path, not transform). For each phase: +for a same-stack uplift (libraries before the apps that depend on them). + +For an **uplift**, leaf-first has three overrides, and getting them wrong is +the most common way an uplift plan fails. Apply them *here*, at planning +time. `/modernize-uplift` Step 1 re-applies the same rules at execution +time (its list also names multi-targeting — the *technique* that satisfies +override 3's first option), and an approved order and a re-derived one must +never disagree — which is exactly what deciding the order without these +would produce: + +1. **The test harness is not a leaf — it is a prerequisite.** Nothing + migrated can be validated until the tests that validate it run on the + target. If `DELTA_CATALOG.md` shows the test framework or its runner + does not support the target runtime (NUnit 2 or MSTest v1 on modern + .NET, JUnit 4 without the vintage engine, `nose` on Python 3, …), then + migrating the test framework is **Phase 1 by itself**, before any + production code moves. +2. **Dependency deltas that every consumer shares force a coordinated + cut** (a major-version bump of an ORM, a namespace move like + `javax`→`jakarta`). These cannot be done leaf-first incrementally — + every consumer changes together — so they get their own cross-cutting + phase. +3. **Shared nodes with consumers *outside* the scope** (PREFLIGHT.md's + scope-boundary check) need an explicit, recorded decision in whichever + phase touches them: keep them buildable for both old and new consumers + through the transition (multi-targeting, publishing for both versions, + a parallel artifact), expand the scope to include the consumers, or + accept and schedule the break. Never silently migrate a shared node in + place and break every consumer nobody was looking at. + +Name the per-phase execution command: `/modernize-transform` (cross-stack +module rewrite), `/modernize-reimagine` (greenfield rebuild), or +`/modernize-uplift` (same-stack version bump — when the target is a newer +version of the *same* stack, this is the path, not transform). For each phase: - Scope (which legacy modules, which target services) - Entry criteria (what must be true to start) - Exit criteria (what tests/metrics prove it's done) @@ -53,11 +104,33 @@ stack, this is the path, not transform). For each phase: units assume, so any time figure here would be misleading.) - Risk level + top 2 risks + mitigation +The named execution command **reads this brief** and treats its phase's +scope, entry criteria, and exit criteria as binding gates. So write entry +criteria as *checkable preconditions* ("baseline recorded in +`analysis/$1/BASELINE.md`", "pilot playbook approved"), not aspirations — +and tell the approver they steer execution by editing this file. An edited +entry criterion is honored; a note in a chat is not. + Render the phases as a Mermaid `flowchart LR` showing **sequence and dependencies** (Phase 1 → Phase 2 → …, with branches where phases are independent). Do **not** use a `gantt` chart — gantt encodes calendar durations, and this plan deliberately makes no time claims. +**Phase 1 is a pilot, and this brief is a hypothesis.** Whenever a phase's +units share one execution recipe (an uplift over many projects, a transform +over many similar modules), name **one representative unit** as that +phase's own first slice. For an uplift, `/modernize-uplift` Step 5a +*enforces* this — it will not fan out without a pilot and its playbook; for +the other execution commands the pilot lives here, written into that +phase's **entry criteria**, which they read as a gate. A reviewer should +see it in this document either way. Say explicitly in §3 that what the pilot +surfaces (a delta the analysis missed, a prerequisite that reorders the +phases, an environment fact nobody wrote down) is *expected* to revise +this brief, and that a regenerated brief after the pilot is the normal +path, not a correction. Legacy systems hide their surprises in the build +and the runtime, not in the source; no amount of reading substitutes for +one unit taken all the way through. + ### 4. Business Walkthroughs For each persona flow in `analysis/$1/topology.json` (`flows` — produced by `/modernize-map`), a short narrative table: persona, what happens in diff --git a/plugins/code-modernization/commands/modernize-preflight.md b/plugins/code-modernization/commands/modernize-preflight.md index 06f7e5a0..cd433888 100644 --- a/plugins/code-modernization/commands/modernize-preflight.md +++ b/plugins/code-modernization/commands/modernize-preflight.md @@ -14,6 +14,49 @@ in the tree. Run every check even when an early one fails — the point is one complete readiness report, not the first error. +## Check 0 — Ask the human (these answers are not in the source) + +Before any automated check, ask the person running this command the five +questions below. The most expensive modernization mistakes are things a +person who knows the system answers in seconds and that cost real money to +discover wrong from the source alone. Ask **only** these — add none — +and accept "don't know" for any of them. + +**Ask, then do not block on the answers.** None of Checks 1–6 needs one +(Check 6 verifies the scope boundary from the source *independently* — the +human's answer says whether a crossing *matters*, not whether it exists), so +proceed to the checks immediately after asking and write the report with +whatever answers exist by then. Any question still unanswered goes in the +report **verbatim, marked as an open item the human must fill in** — it is +not dropped. This way an interactive user answers while the checks run, a +headless or scripted run still produces a complete `PREFLIGHT.md`, and the +one thing that never happens is a readiness report silently missing the +questions. + +1. **Scope** — Is `legacy/$1` the complete system, or one slice of a + larger codebase? If a slice: what *outside* it depends on code *inside* + it, and is breaking those consumers acceptable? (Check 6 verifies this + from the source independently; the human's answer says whether it + *matters*.) +2. **Build & test locally** — Can this environment restore, build, and run + the tests? Roughly how long does the full CI pipeline take? (A pipeline + measured in hours changes the whole validation strategy: you cannot + afford to first learn you were wrong from CI.) +3. **Bespoke build infrastructure** — Is there organization-specific build + or dependency-resolution machinery (an internal package feed, a custom + binary store, a code generator, a wrapper around the standard build + tool) that someone new to this codebase would not guess? Where is it + documented? +4. **Prior attempts** — Has anyone tried to modernize any of this before? + What went wrong? +5. **Off limits** — Is anything under `legacy/$1` not allowed to change in + this pass (a component another team owns, a frozen branch, generated + code)? + +Record every answer **verbatim** in the report — downstream commands, and +`/modernize-brief` most of all, read them from there. Do not paraphrase +away a caveat the human gave you. + ## Check 1 — Detect the stack Fingerprint `legacy/$1` from file extensions and manifests: languages, @@ -35,19 +78,51 @@ used for, and what degrades without it: Include the platform's install one-liner for anything missing (`brew install scc`, `apt install cloc`, `pip install lizard`, …). -## Check 3 — Build toolchain (smoke test, not just presence) - -Identify the compiler/interpreter for the detected legacy stack — e.g. -GnuCOBOL (`cobc`) for COBOL, JDK + Maven/Gradle for Java, `cc`/`make` for -C, `dotnet` for .NET. Then **prove it works on this codebase**: pick one -representative source file and run a syntax-only compile -(`cobc -fsyntax-only`, `javac`, `gcc -fsyntax-only`, …). - -A failed smoke test is the most valuable output of this command — report -the actual error and diagnose it: missing copybook/include path, missing -dialect flag (`-std=ibm` etc.), fixed vs free format, missing dependency -jar. These are the errors that otherwise surface mid-`/modernize-transform` -with much less context. +## Check 3 — Build toolchain (prove it on THIS codebase, not just presence) + +**3a — The build definition is the ground truth. Find it and read it +before guessing.** Something already builds this system; go find out how. +Look for the CI/pipeline definition (`azure-pipelines.yml`, `Jenkinsfile`, +`.github/workflows/`, `.gitlab-ci.yml`, `bitbucket-pipelines.yml`, build +JCL procs, a `Makefile`) and any organization-level build configuration +above or beside the source (`Directory.Build.props`/`.targets` and +`nuget.config` in .NET; a parent POM, a `settings.xml` mirror, or a +`.mvn/` directory in Java; a private-registry `.npmrc`/`pip.conf`; a root +`build/`, `eng/`, `tools/`, or `scripts/` directory). These files are the +single most honest document about how the system *actually* builds: the +exact toolchain version it pins, where dependency binaries really come +from, and which steps a naive build invocation skips. Every mid-migration +"wait, how do dependencies resolve here?" surprise is already written down +in one of them. Report what you found (or that none exists), quote the +pinned toolchain version and the dependency source, and flag anything +bespoke — a homegrown binary-resolution scheme is exactly the thing a +transformation must not have to discover halfway through. + +**3b — Smoke test, escalating.** Identify the compiler/interpreter for the +detected legacy stack — e.g. GnuCOBOL (`cobc`) for COBOL, a JDK + +Maven/Gradle for Java, `cc`/`make` for C, `dotnet` for .NET — then **prove +it works on this codebase**, at the strongest level available: + +- **Level 1 (any stack) — syntax-compile one representative source file** + (`cobc -fsyntax-only`, `javac`, `gcc -fsyntax-only`, …). This catches + missing copybooks/includes, dialect flags, fixed-vs-free format. +- **Level 2 (any stack with a build system) — restore + build ONE whole + project/module the way 3a says the CI does.** A single file + syntax-compiling proves almost nothing about a real build system: a + restore that hits a private feed, a code-generation step, a shared props + file, a pinned SDK are all invisible to a one-file compile — and are + exactly where large codebases hide their surprises. Pick one small + *real* unit and take it all the way through. + +A failed smoke test at either level is the most valuable output of this +whole command — report the actual error and diagnose it: missing +copybook/include path, missing dialect flag (`-std=ibm` etc.), fixed vs +free format, a dependency the standard feed cannot resolve. These are the +errors that otherwise surface mid-transformation with far less context. +Level 2 being *impossible* (no build system in the tree, a mainframe stack +with no local runtime) is normal for some legacy code: report it as a +fact, not a failure — equivalence then degrades to recorded traces, which +the other commands already handle. If the user passed a `[target-stack]`, do the same for it: runtime, package manager, test framework (`mvn -v`, `npm -v`, `pytest --version`, …). @@ -78,15 +153,51 @@ detected stack's equivalents of: - **Version control history** — is `legacy/$1` under git with meaningful history? (Change-frequency data sharpens risk ranking.) +## Check 6 — Scope boundary (is `$1` the whole world, or a slice of one?) + +Every downstream command assumes `legacy/$1` *is* the system. When it is +actually **one directory inside a larger source repository** — a module in +a monorepo, one solution folder inside a much bigger solution, a subsystem +sharing copybooks or includes with siblings — that assumption is the most +dangerous thing in the whole run, and nothing else checks it. + +Detect it: after resolving the `legacy/$1` symlink (the recommended setup +symlinks real code in), is there a repository / solution / workspace / +reactor root *above* it? Do manifests or includes *inside* `$1` reference +paths *outside* it? If either is true, report **both directions** of the +boundary crossing: + +- **Outbound** — things inside `$1` that depend on source *outside* it + (project/module references, shared includes, a parent build file). The + `/modernize-map` topology and any delta catalog only see what is under + `$1`, so every outbound reference is a dependency they will silently + miss. List them. +- **Inbound** — things *outside* `$1` that depend on things *inside* it. + This is the **blast radius**: an in-place migration (`/modernize-uplift`) + of a node with external consumers breaks every one of them. Grep the + sibling manifests for references into `$1`, enumerate the + inbound-referenced nodes, and say plainly that each needs an explicit + decision *before* any in-place change — keep it buildable for both old + and new consumers during the transition, expand the scope to include the + consumers, or accept and schedule the break. Never let this be + discovered by a broken build in a directory nobody was looking at. + +If `$1` really is a standalone repository, one line saying so is the whole +check — it is cheap when it does not apply. + ## Report -Write `analysis/$1/PREFLIGHT.md`: a status table — one row per check, -status ✅ / ⚠️ / ❌, what was found, and the fix for anything not green — -followed by a **Ready / Ready-with-gaps / Not ready** verdict per command: +Write `analysis/$1/PREFLIGHT.md`. It **leads with the Check 0 answers, +verbatim, and the Check 6 scope-boundary finding** — those two are read by +every downstream command (`/modernize-brief` above all) and are worth +nothing paraphrased. Then a status table — one row per check, status +✅ / ⚠️ / ❌, what was found, and the fix for anything not green — followed +by a **Ready / Ready-with-gaps / Not ready** verdict per command: - `assess` + `map` + `extract-rules` — need Checks 1–2 green-ish and Check 4's missing-include count low -- `brief` — needs only the three discovery artifacts; no tooling +- `brief` — needs only the three discovery artifacts (plus + `DELTA_CATALOG.md` when the plan is a same-stack uplift); no tooling - `transform` + `reimagine` — additionally need Check 3 green for the **target** stack. A red legacy toolchain downgrades these to Ready-with-gaps, not Not-ready: equivalence testing falls back to @@ -101,7 +212,15 @@ followed by a **Ready / Ready-with-gaps / Not ready** verdict per command: which). (b) Is the stack's **migration tool** installed (`dotnet tool list` for `upgrade-assistant`, `apiport`, OpenRewrite, `pyupgrade`, `ng`)? Missing is Ready-with-gaps, not Not-ready — the delta catalog is then fully - Claude-derived and loses the tool's coverage; note that. + Claude-derived and loses the tool's coverage; note that. (c) Did Check 6 + find **inbound external consumers** of `$1`? That is **Ready-with-gaps**, + not Not-ready — preflight runs before any plan exists, so there is nowhere + yet to record a decision — but it is the gap that matters most: name the + inbound-referenced shared nodes and say that `/modernize-brief` must give + each one an explicit transition decision as its own line item (Check 6 + lists the options), and that `/modernize-uplift` Step 1 will not migrate a + shared node in place without one. Never let this be discovered from a + sibling's broken build. Print the table in the session too, and end with the single most important fix if anything is red. diff --git a/plugins/code-modernization/commands/modernize-reimagine.md b/plugins/code-modernization/commands/modernize-reimagine.md index 668ef60f..5b0ecb12 100644 --- a/plugins/code-modernization/commands/modernize-reimagine.md +++ b/plugins/code-modernization/commands/modernize-reimagine.md @@ -13,6 +13,19 @@ This is not a port — it's a rebuild from extracted intent. The legacy system becomes the *specification source*, not the structural template. This command orchestrates a multi-agent team with explicit human checkpoints. +**The brief is binding — read it first.** If `analysis/$1/MODERNIZATION_BRIEF.md` +exists, this reimagine is executing one of its phases: read it before doing +anything below. Find the phase that names this command with a scope matching +`$1` and <vision>, and treat that phase's **scope, entry criteria, exit +criteria, and any edits the user made to it** as binding on the phases below +— on top of, never instead of, this command's own two HITL checkpoints. +Entry criteria are *gates*, not context: if one is not met (a prior phase's +exit criteria, an SME sign-off the brief requires), meeting it **is** the +next step — do not proceed past it and do not silently re-plan around it. If +the brief exists but no phase matches, stop and ask which phase this is. The +user steers execution by editing the brief; a brief the execution command +never reads cannot steer anything. + ## Phase A — Specification mining (parallel agents) Spawn concurrently and show the user that all three are running: diff --git a/plugins/code-modernization/commands/modernize-status.md b/plugins/code-modernization/commands/modernize-status.md index c4de7860..575c3c1f 100644 --- a/plugins/code-modernization/commands/modernize-status.md +++ b/plugins/code-modernization/commands/modernize-status.md @@ -13,13 +13,13 @@ workflow stage, with the artifact's presence and modification time: | Stage | Artifacts | |---|---| -| preflight | `PREFLIGHT.md` | +| preflight | `PREFLIGHT.md` (note whether the Check 0 human answers and the Check 6 scope-boundary finding are present) | | assess | `ASSESSMENT.md`, `ARCHITECTURE.mmd` | | map | `topology.json`, `TOPOLOGY.html`, `*.mmd`, `extract_topology.*` | | extract-rules | `BUSINESS_RULES.md`, `DATA_OBJECTS.md` | | brief | `MODERNIZATION_BRIEF.md` (note whether the approval block is signed) | | harden | `SECURITY_FINDINGS.md`, `security_remediation.patch` | -| uplift | `DELTA_CATALOG.md`; `modernized/$1-uplifted/UPLIFT_NOTES.md` (note per-project: builds on target? baseline reproduced?) | +| uplift | `DELTA_CATALOG.md`, `BASELINE.md`, `PLAYBOOK.md` (no playbook = the pilot hasn't happened yet — the fan-out must not); `modernized/$1-uplifted/UPLIFT_NOTES.md` (note per-unit: builds on target? baseline reproduced?) | | transform | each `modernized/$1/<module>/` dir — note test presence and whether `TRANSFORMATION_NOTES.md` exists | | reimagine | `modernized/$1-reimagined/` — note per-service acceptance tests and the `CLAUDE.md` handoff (reimagine's completion markers; it does NOT write `TRANSFORMATION_NOTES.md`) | @@ -30,6 +30,10 @@ Flag any artifact older than an upstream artifact it derives from: - `MODERNIZATION_BRIEF.md` older than `ASSESSMENT.md`, `topology.json`, or `BUSINESS_RULES.md` → the brief no longer reflects discovery; recommend re-running `/modernize-brief`. +- `MODERNIZATION_BRIEF.md` for a same-stack **uplift** plan that is older + than `DELTA_CATALOG.md` — or that has no catalog at all — → the phase + order was decided before (or without) the version deltas that determine + it; recommend re-running `/modernize-brief`. - `TOPOLOGY.html` older than `topology.json` → re-run the injection step from `/modernize-map`. - Any `TRANSFORMATION_NOTES.md` older than `BUSINESS_RULES.md` → the diff --git a/plugins/code-modernization/commands/modernize-transform.md b/plugins/code-modernization/commands/modernize-transform.md index 8183fd46..d946b93f 100644 --- a/plugins/code-modernization/commands/modernize-transform.md +++ b/plugins/code-modernization/commands/modernize-transform.md @@ -37,6 +37,18 @@ first run: ## Step 0b — Plan (HITL gate) +**The brief is binding — read it first.** If `analysis/$1/MODERNIZATION_BRIEF.md` +exists, this transform is one phase (or one module of a phase) of that plan: +read it before deciding anything below. Find the phase that names this +command with `$2` in scope, and treat that phase's **scope, entry criteria, +exit criteria, and any edits the user made to it** as binding on the plan +you present below. Entry criteria are *gates*, not context: if one is not +met (a prior phase's exit criteria, an SME sign-off the brief requires), +meeting it **is** the next step — do not proceed past it and do not silently +re-plan around it. If the brief exists but no phase covers `$2`, stop and +ask which phase this is. The user steers execution by editing the brief; a +brief the execution command never reads cannot steer anything. + Read the source module and any business rules in `analysis/$1/BUSINESS_RULES.md` that reference it. Then present the plan and **stop — write no code until the user explicitly approves** (use plan mode if the session supports it): diff --git a/plugins/code-modernization/commands/modernize-uplift.md b/plugins/code-modernization/commands/modernize-uplift.md index 3a107aed..8df350fc 100644 --- a/plugins/code-modernization/commands/modernize-uplift.md +++ b/plugins/code-modernization/commands/modernize-uplift.md @@ -48,7 +48,20 @@ Optional 4th arg `$4` scopes to projects/modules matching a pattern. recorded/expected outputs (as in `/modernize-transform`). Note this in the plan and UPLIFT_NOTES — reviewers must know whether the proof was a true dual-run or target-only. -4. **Detect the ecosystem migration tool** — and distinguish **present / +4. **Test framework on the target — the one question that reshapes the plan.** + Answer, before any planning: *can the existing test suite execute on $3 + as-is?* The test framework is a dependency like any other, and one whose + runner/adapter does not support the target runtime is the single most + common reason an uplift's phase order comes out wrong: the test migration + is then a **prerequisite, not a leaf**, because nothing you migrate can be + validated until the tests that validate it run on $3. Read the framework + and version out of the test manifests and check it against $3 — NUnit 2 or + MSTest v1 cannot execute on modern .NET, JUnit 4 needs the vintage engine + on newer platforms, `nose`/`unittest2` do not run on Python 3, and so on + for whatever this stack's test manifests declare. If the answer is no, say + so now: it becomes an explicit *early* phase in the plan (Step 2) and in + `/modernize-brief`, never a trailing one. +5. **Detect the ecosystem migration tool** — and distinguish **present / runnable-here / actually-ran**. Most of these tools need a working restore + build (and often network), which a read-only sandbox does not have, so "installed" ≠ "produced findings". Report all three states and @@ -70,6 +83,18 @@ Run `/modernize-preflight $1 $3` for the full readiness report. ## Step 1 — Working copy, project graph & ordering +**The brief is binding — read it first.** If `analysis/$1/MODERNIZATION_BRIEF.md` +exists, this invocation is executing one of its phases: read it before +deciding anything below. Find the phase that names this command with a scope +matching `$1`/`$4`, and treat that phase's **scope, entry criteria, exit +criteria, and any edits the user made to it** as binding on the plan you +present in Step 2. Entry criteria are *gates*, not context: if one is not met +("baseline recorded", "pilot playbook approved"), meeting it **is** the next +step — do not proceed past it and do not silently re-plan around it. If the +brief exists but no phase matches, stop and ask which phase this is. The user +steers execution by editing the brief; a brief the execution command never +reads cannot steer anything. + **Working copy (do this first).** An uplift edits an existing solution *in place* — it bumps target frameworks and fixes APIs while keeping the `.sln`, the relative `<ProjectReference>`/module paths, and a reviewable `git diff`. @@ -100,6 +125,18 @@ leaf-first — call them out in the plan: libs so old and new consumers can both reference them while the migration is in flight (the standard .NET technique). Note cycles in the project graph need a manual cut point. +- **Shared nodes with consumers OUTSIDE this scope need a recorded decision + before an in-place edit.** Read `analysis/$1/PREFLIGHT.md` if it exists: + its Check 6 lists the nodes under `$1` that source *outside* `$1` depends + on. Uplifting such a node in place breaks every external consumer nobody + is looking at — the one kind of damage this command can do beyond its own + scope. Do not migrate one without a recorded transition decision (the + brief's §3 owns it): keep the node buildable for both old and new + consumers through the transition — for many stacks that is exactly the + multi-targeting technique above — or expand the scope to include the + consumers, or accept and schedule the break. If a shared node has no + recorded decision, getting one from the user **is** that node's entry + criterion: stop and ask. Scope to `$4` if given. Present the working-copy plan and the order. @@ -125,6 +162,12 @@ This replaces `/modernize-transform`'s business-rule extraction. Build `analysis/$1/DELTA_CATALOG.md`: the breaking/behavioral changes between $2 and $3 **that this code actually hits**. +**Reuse it if it already exists and is fresh.** `/modernize-brief` requires +this catalog for an uplift and may have just produced it by running this +very step. If `analysis/$1/DELTA_CATALOG.md` exists and is newer than the +source under `legacy/$1`, read it and move on — do not re-run the fan-out to +re-derive the identical artifact. Regenerate only if it is missing or stale. + **Preferred — Workflow orchestration.** If the **Workflow tool** is available (this invocation authorizes it): @@ -170,10 +213,13 @@ this order so you de-risk the oracle before depending on it: fix the harness now — not mid-migration. (This is the structure `test-engineer` then fills.) If the $2 leg can't run here (Step 0.3), prove the $3 leg only and mark the proof target-only. -2. **Baseline = the oracle.** Run the existing suite on the **$2** target and - record pass/fail per test. This is the equivalence target — including any - tests that legacy fails. You are proving *no behavior changed*, not *all - tests pass*. +2. **Baseline = the oracle. Record it in a file, not in your head.** Run the + existing suite on the **$2** target and write the per-test pass/fail table + to **`analysis/$1/BASELINE.md`**. This is the equivalence target — + including any tests that legacy fails. You are proving *no behavior + changed*, not *all tests pass*. The file is the point: Step 5 refuses to + start until it exists, so a migration can neither begin without an oracle + nor quietly skip this step under the pressure of many units. 3. **Gap-fill at delta sites.** Using `DELTA_CATALOG.md`, spawn `test-engineer` to add characterization tests specifically where **Behavioral-silent** deltas touch under-tested code (culture, encoding, serialization, dates). @@ -182,8 +228,25 @@ this order so you de-risk the oracle before depending on it: If only the target runtime is available (Step 0.3), there is no $2 run: pin the gap-fill tests to expected/recorded outputs and label the proof target-only. - -## Step 5 — Migrate, leaf-first, minimal-diff +`analysis/$1/BASELINE.md` still gets written — as the one-line honest record +`target-only: <why the $2 runtime is unavailable here>` rather than a table — +because Step 5 gates on the file existing either way. + +## Step 5 — Migrate: pilot ONE unit, then fan out in batches + +**Gate — do not start until `analysis/$1/BASELINE.md` exists** (Step 4.2): +either the per-test $2 pass/fail table, or the one-line +`target-only: <why the $2 runtime is unavailable here>` record. If it does +not exist, writing it **is** the next step — not something to come back to. +A migration without a baseline has no oracle: "the tests pass on $3" means +nothing if you never learned what they did on $2. + +**Never migrate everything at once.** The delta catalog is a hypothesis built +by *reading*; the **build system** is where a legacy codebase hides its +surprises — a bespoke dependency-resolution scheme, a pinned toolchain, a +shared props file, a code-generation step — and none of that enters the +catalog until a real migration hits it. The cheapest place to hit it is one +unit, not N. All editing happens **in place inside the working copy `modernized/$1-uplifted/`** from Step 1 (so relative project references resolve and the result is a clean @@ -191,7 +254,8 @@ Step 1 (so relative project references resolve and the result is a clean tools (`upgrade-assistant`, `ng update`) mutate the tree in place — that is fine *here* because they run against the `modernized/$1-uplifted/` copy, not `legacy/`. -For each project in dependency order (respecting the Step 1 overrides): +Per **unit** (a project / module / package — one node in the Step 1 graph), +the recipe is always the same: 1. **Run the ecosystem codemod** for the Mechanical deltas (`upgrade-assistant` apply / OpenRewrite recipe / `pyupgrade` / `ng update`) against the copy. 2. **Apply the Judgment deltas** by hand from the catalog. @@ -203,12 +267,127 @@ For each project in dependency order (respecting the Step 1 overrides): here (the inverse of its usual job): any change beyond the minimal uplift is a finding. -Keep going until the project **builds on $3**. +Keep going until the unit **builds on $3**. + +### 5a — Pilot (mandatory; do it yourself, in-session, never in a workflow) + +Take **one representative unit** all the way through the recipe above until +it builds on $3 and reproduces its `BASELINE.md` result. *Representative* +means it exercises the highest-blast-radius deltas from the catalog — a +mid-complexity unit, **not the easiest one**. An easy pilot teaches you +nothing you can reuse. + +Two outputs, both mandatory before any other unit is touched: + +- **Feed the catalog.** Every surprise the pilot hits that `DELTA_CATALOG.md` + did not predict — a build error, a step the ecosystem tool got wrong, an + environment fact you had to discover — is a delta the catalog missed. Add + it now, while you still know why. +- **Write `analysis/$1/PLAYBOOK.md`** — the proven recipe, and the single + most valuable artifact of the whole migration. Concretely: the ordered + sequence of edits for one unit; every error hit and what resolved it; + every environment fact you had to *discover* rather than already knew + (which toolchain version is really in use, how dependency binaries + actually resolve, which shared config file governs the build); and the + exact build command that proves a unit is done. **Write it as instructions + to an engineer who has not read this conversation** — the fan-out agents + in 5b are exactly that. Never a credential value in it. + +Then **stop and show the user** the pilot's diff, what it added to the +catalog, and the playbook — *before* any fan-out. The pilot is where a +human catches the surprise that would otherwise be replicated N times over. +If the pilot changed the picture materially (a prerequisite you missed, a +phase in the wrong order), that is a finding about the **brief**, not just +about this step — say so and update `MODERNIZATION_BRIEF.md` before +continuing. + +### 5b — Fan out in dependency-aware escalating batches + +Only after the user has seen the pilot. If only a handful of units remain, +skip the machinery: repeat the recipe per unit, in dependency order, +in-session. + +For many units, **the playbook is the prompt.** Do not brief fan-out agents +from your general knowledge of the stack; brief them from what the pilot +*proved about this codebase*. If the **Workflow tool** is available (this +invocation authorizes it): + +``` +Workflow({ + scriptPath: "${CLAUDE_PLUGIN_ROOT}/workflows/uplift-migrate.js", + args: { system: "$1", source: "$2", target: "$3", + units: [ { name: "<unit>", path: "<dir relative to modernized/$1-uplifted/>", + deps: ["<name of a sibling unit this one depends on>", ...] }, + ... ] } +}) +``` + +Enumerate `units` from the Step 1 graph, **excluding the pilot** and +excluding any unit in a Step 1 *coordinated cut* (those change together and +belong in-session, not in a per-unit fan-out). **`deps` is how the fan-out +honors the dependency order** — for each unit, list the *other units in this +list* it depends on, straight from the Step 1 graph. The workflow only +migrates a unit once every dep it lists has **built**, so a unit and the +unit it depends on never build concurrently against each other in the same +working copy; and a unit whose dependency *failed to build* is never +attempted at all — its build would fail for the dependency's reason, not the +playbook's, which is exactly the noise that would falsely trip the circuit +breaker. Naming the pilot (or a unit migrated in-session) as a dep is fine — +it counts as already satisfied. Omitting `deps` opts that unit out of the +ordering, so do not leave them off to save typing. + +Tell the user how many units before launching, and how they will run: in +dependency-aware escalating batches (~4, then larger — never all N in one +shot), one agent per **unit** (never per file — a per-file agent cannot see +the unit's manifest or run its build), each agent editing only inside its +own unit's directory and running that unit's real build before reporting, +and a **circuit breaker** that stops — instead of spending the rest of the +budget — the moment a batch's build rate drops below two-thirds. The correct +response to a failing batch is a better playbook, not more agents. + +One operational note to give the user before launching: the fan-out agents +change files and run builds, largely unattended once approved. The README's +recommended workspace settings only guard the **file tools** (they deny +`Edit`/`Write` on `legacy/`); a shell command that writes a file goes +through **Bash permissions instead**, and that prompt is the control that +keeps a prompt-injected agent inside its scope. Keep Bash on a *prompted* +permission mode for this step rather than blanket-allowing it to make the +fan-out faster — and if the session's permission mode auto-approves Bash, +say so and treat the fan-out's resulting diff as untrusted until reviewed. + +When the workflow returns: +- **Cross-cutting edits are yours.** Apply the returned `sharedFileNeeds` + (the solution/workspace manifest, shared build config) yourself — the + agents correctly refused to touch files they would race each other on. +- **Fold `playbookGaps` back into `PLAYBOOK.md`** before doing anything else + with the un-migrated units. This is the loop that makes each batch cheaper + than the last. +- The result carries **three re-passable unit lists**, each already in the + `{name, path, deps}` shape that `units` takes — so continuing never means + re-deriving anything: `remainingUnits` (never attempted), `failedUnits` + (attempted; the build failed), and `blockedUnits` (never attempted because + a unit they depend on did not build). **A unit in `failedUnits` or + `blockedUnits` is NOT migrated** — an empty `remainingUnits` alone does + not mean you are done. +- If it **aborted early**, that is the circuit breaker doing its job, not a + failure to route around: revise the playbook from the gaps and the build + errors, re-verify the revision on one of the *failed* units in-session, + and only then re-invoke with + `units: <failedUnits + blockedUnits + remainingUnits>`. +- Repeat until all three lists are empty, then verify it yourself: each + agent's `built` flag is self-reported, so re-run the full build across the + whole working copy before moving to Step 6. + +**Fallback** (no Workflow tool): the same discipline by hand. Spawn the +**uplift-migrator** agent per unit in batches of ~4, wait for the batch, +fold its playbook gaps back in, check the build rate, and only then launch +the next batch. Never launch all N in one shot. ## Step 6 — Dual-run diff (the proof) Run the **same suite** on both targets (or target-only per Step 0.3): -- Every test must reproduce the **$2 baseline** result. A test that passed on +- Every test must reproduce its result recorded in + **`analysis/$1/BASELINE.md`** (Step 4.2). A test that passed on $2 and fails on $3 is a regression; one that failed on $2 and now passes is a behavior change to adjudicate (intended fix vs accidental). - Triage **every** result delta: intended fix vs regression. Unexplained @@ -222,7 +401,9 @@ Write `modernized/$1-uplifted/UPLIFT_NOTES.md`: - Dual-run diff table (or "target-only — source runtime unavailable here") - **Residual manual deltas** the tooling/this pass could not handle - **Deferred modernization** explicitly NOT done (kept the diff minimal) -- Per-project: builds on $3 (y/n), baseline reproduced (y/n) +- Per-unit: builds on $3 (y/n), baseline reproduced (y/n) +- A pointer to `analysis/$1/PLAYBOOK.md` with its final gap list — the proven + recipe is worth more than this diff to whoever uplifts the next system ## Secrets discipline |
