diff options
| author | Jesse Vincent <jesse@primeradiant.com> | 2026-06-10 21:44:23 -0700 |
|---|---|---|
| committer | Drew Ritter <drew@primeradiant.com> | 2026-06-16 10:09:47 -0700 |
| commit | 25192df30bdc098768f657eed4e7e92392c6ae6a (patch) | |
| tree | a62dc62b056931176982f1109b484558bf172d59 /docs | |
| parent | f5e8df425264a44e85f28c982972617dbf120eb7 (diff) | |
Strict-cost spec: L1 final — cost win re-attributed to complete-code plans; guidance owns fidelity/variance
Diffstat (limited to 'docs')
| -rw-r--r-- | docs/superpowers/specs/2026-06-10-strict-cost-sdd-design.md | 22 |
1 files changed, 15 insertions, 7 deletions
diff --git a/docs/superpowers/specs/2026-06-10-strict-cost-sdd-design.md b/docs/superpowers/specs/2026-06-10-strict-cost-sdd-design.md index dd21216..5506cf8 100644 --- a/docs/superpowers/specs/2026-06-10-strict-cost-sdd-design.md +++ b/docs/superpowers/specs/2026-06-10-strict-cost-sdd-design.md @@ -65,13 +65,21 @@ fewer, better-sized tasks, SDD still runs one fresh subagent per task. ### L1 — Plan-side crispness (writing-plans changes; est. −$1.5-3/run, plus variance reduction) -**Status 2026-06-11: validated in effect.** A hand-crisped fractals plan -(10 → 7 tasks, `## Global Constraints` header, per-task `Interfaces:` -lines — scenario `sdd-go-fractals-crisp`) ran 3/3 green at $9.51-12.65 -(mean $11.60 vs combo band $11.67-14.84), 20-24 dispatches vs 28, fix -waves flat. What remains is elicitation: getting writing-plans guidance -to *produce* such plans (micro-test per the doctrine, then the follow-up -PR). See the experiments log, Batch A-E. +**Status 2026-06-11 (final): elicitation tested end-to-end; claims +re-attributed.** Micro-tests: constraints header and Interfaces blocks +elicit deterministically (0→5/5, 0→100% of tasks, exact values); +right-sizing is modest and scale-dependent (9.4→8.4 tasks at svelte +scale, nothing to move at fractals scale). Full runs: an elicited plan +executed at $6.34/$8.49 — but the no-guidance control (opus plan, +complete code) hit $7.59/$7.73, inside that range. **The cost win +belongs to opus-written complete-code plans; the hand-written prose +fixture plans all prior numbers used are unrepresentative and ~2× +costlier to execute.** The guidance owns fidelity and variance instead: +deterministic constraints propagation (the one elicited-run fix was a +version-floor catch), exact cross-task interfaces, fix waves 1 vs 2-4 +(the control plan shipped a real Sierpinski bug both runs had to fix). +The writing-plans PR claims those grounds, not dollars. Draft at +/tmp/sdd-exp/writing-plans-l1 (branch writing-plans-crisp). The plan is upstream of every cost: task count sets dispatch count; plan ambiguity sets review-loop count; plan completeness sets implementer |
