diff options
| author | Bryan Thompson <bthompson@anthropic.com> | 2026-06-22 20:03:36 -0500 |
|---|---|---|
| committer | Bryan Thompson <bthompson@anthropic.com> | 2026-06-22 20:03:36 -0500 |
| commit | 7bc909dc203c249bfed698dc5095c956483cc80e (patch) | |
| tree | 9683cb5c05e4a9494e9c8054cd09036940389cd0 /plugins/code-modernization/commands/modernize-brief.md | |
| parent | 286eb1e2178e64571fe339576b06ea03b7754ece (diff) | |
| parent | b8c05307dbdfcc8bc4ba48e44dbae5a87e30512d (diff) | |
Merge main into add-hana-cli (refresh 991-commit-stale branch)add-hana-cli
Diffstat (limited to 'plugins/code-modernization/commands/modernize-brief.md')
| -rw-r--r-- | plugins/code-modernization/commands/modernize-brief.md | 62 |
1 files changed, 47 insertions, 15 deletions
diff --git a/plugins/code-modernization/commands/modernize-brief.md b/plugins/code-modernization/commands/modernize-brief.md index 28eeb624..53e4bb3d 100644 --- a/plugins/code-modernization/commands/modernize-brief.md +++ b/plugins/code-modernization/commands/modernize-brief.md @@ -8,10 +8,19 @@ single document a steering committee approves and engineering executes. Target stack: `$2` (if blank, recommend one based on the assessment findings). -Read `analysis/$1/ASSESSMENT.md`, `analysis/$1/TOPOLOGY.html` (and the `.mmd` -files alongside it), and `analysis/$1/BUSINESS_RULES.md` first. If any are -missing, say so and stop — they come from `/modernize-assess`, `/modernize-map`, -and `/modernize-extract-rules` respectively. Run those first. +Read `analysis/$1/ASSESSMENT.md`, `analysis/$1/topology.json` (plus the +`.mmd` files alongside it — do NOT read `TOPOLOGY.html`, it's an +interactive viewer with the data minified inside), and +`analysis/$1/BUSINESS_RULES.md` first. If any are missing, say so and +stop — they come from `/modernize-assess`, `/modernize-map`, and +`/modernize-extract-rules` respectively. Run those first. + +**Staleness check:** compare modification times. If any input is newer +than an existing `MODERNIZATION_BRIEF.md`, the brief is being justifiably +regenerated; but if an existing brief is newer than all inputs and the +user re-ran this command anyway, ask what changed. Either way, note the +input timestamps in the brief's header so reviewers can see what it was +built from. ## The Brief @@ -26,33 +35,55 @@ store, and integration. Below it, a table mapping legacy component → target component(s). ### 3. Phased Sequence -Break the work into 3-6 phases using **strangler-fig ordering** — lowest-risk, -fewest-dependencies first. For each phase: +Break the work into 3-6 phases. Order by **strangler-fig** for a cross-stack +rewrite (lowest-risk, fewest-dependencies first), or **build-graph leaf-first** +for a same-stack uplift (libraries before the apps that depend on them). Name +the per-phase execution command: `/modernize-transform` (cross-stack module +rewrite), `/modernize-reimagine` (greenfield rebuild), or `/modernize-uplift` +(same-stack version bump — when the target is a newer version of the *same* +stack, this is the path, not transform). For each phase: - Scope (which legacy modules, which target services) - Entry criteria (what must be true to start) - Exit criteria (what tests/metrics prove it's done) -- Estimated effort (person-weeks, derived from COCOMO + complexity data) +- Relative scale (T-shirt size — S/M/L/XL — anchored to the phase's share + of the assessment's COCOMO complexity index. This ranks phases by size + against each other; it is **not** a duration. Do **not** state + person-months, weeks, calendar dates, or a delivery estimate — agentic + transformation does not follow the human-team productivity curves those + units assume, so any time figure here would be misleading.) - Risk level + top 2 risks + mitigation -Render the phases as a Mermaid `gantt` chart. +Render the phases as a Mermaid `flowchart LR` showing **sequence and +dependencies** (Phase 1 → Phase 2 → …, with branches where phases are +independent). Do **not** use a `gantt` chart — gantt encodes calendar +durations, and this plan deliberately makes no time claims. + +### 4. Business Walkthroughs +For each persona flow in `analysis/$1/topology.json` (`flows` — produced +by `/modernize-map`), a short narrative table: persona, what happens in +business language, which legacy modules implement it today, and which +phase from §3 replaces each. This is the section non-technical approvers +actually read — it connects "Phase 2" to "what happens when a customer +files a claim". If topology.json has no flows, derive 2–3 walkthroughs +from the entry points and say they need SME confirmation. -### 4. Behavior Contract +### 5. Behavior Contract List the **P0 rules** from BUSINESS_RULES.md (the ones tagged `Priority: P0` — money, regulatory, data integrity) that MUST be proven equivalent before any phase ships. These become the regression suite. Flag any P0 rule with Confidence < High as a blocker requiring SME confirmation before its phase starts. -### 5. Validation Strategy +### 6. Validation Strategy State which combination applies: characterization tests, contract tests, parallel-run / dual-execution diff, property-based tests, manual UAT. Justify per phase. -### 6. Open Questions +### 7. Open Questions Anything requiring human/SME decision before Phase 1 starts. Each as a checkbox the approver must tick. -### 7. Approval Block +### 8. Approval Block ``` Approved by: ________________ Date: __________ Approval covers: Phase 1 only | Full plan @@ -60,6 +91,7 @@ Approval covers: Phase 1 only | Full plan ## Present -Enter **plan mode** and present a summary of the brief. Do NOT proceed to any -transformation until the user explicitly approves. This gate is the -human-in-the-loop control point. +Present a summary of the brief and **stop — write nothing further until +the user explicitly approves** (use plan mode if the session supports +it). This gate is the human-in-the-loop control point; "no objection" is +not approval. |
