diff --git a/plugins/code-modernization/commands/modernize-brief.md b/plugins/code-modernization/commands/modernize-brief.md
index 28eeb624..53e4bb3d 100644
--- a/plugins/code-modernization/commands/modernize-brief.md
+++ b/plugins/code-modernization/commands/modernize-brief.md
@@ -8,10 +8,19 @@ single document a steering committee approves and engineering executes.
Target stack: `$2` (if blank, recommend one based on the assessment findings).
-Read `analysis/$1/ASSESSMENT.md`, `analysis/$1/TOPOLOGY.html` (and the `.mmd`
-files alongside it), and `analysis/$1/BUSINESS_RULES.md` first. If any are
-missing, say so and stop — they come from `/modernize-assess`, `/modernize-map`,
-and `/modernize-extract-rules` respectively. Run those first.
+Read `analysis/$1/ASSESSMENT.md`, `analysis/$1/topology.json` (plus the
+`.mmd` files alongside it — do NOT read `TOPOLOGY.html`, it's an
+interactive viewer with the data minified inside), and
+`analysis/$1/BUSINESS_RULES.md` first. If any are missing, say so and
+stop — they come from `/modernize-assess`, `/modernize-map`, and
+`/modernize-extract-rules` respectively. Run those first.
+
+**Staleness check:** compare modification times. If any input is newer
+than an existing `MODERNIZATION_BRIEF.md`, the brief is being justifiably
+regenerated; but if an existing brief is newer than all inputs and the
+user re-ran this command anyway, ask what changed. Either way, note the
+input timestamps in the brief's header so reviewers can see what it was
+built from.
## The Brief
@@ -26,33 +35,55 @@ store, and integration. Below it, a table mapping legacy component → target
component(s).
### 3. Phased Sequence
-Break the work into 3-6 phases using **strangler-fig ordering** — lowest-risk,
-fewest-dependencies first. For each phase:
+Break the work into 3-6 phases. Order by **strangler-fig** for a cross-stack
+rewrite (lowest-risk, fewest-dependencies first), or **build-graph leaf-first**
+for a same-stack uplift (libraries before the apps that depend on them). Name
+the per-phase execution command: `/modernize-transform` (cross-stack module
+rewrite), `/modernize-reimagine` (greenfield rebuild), or `/modernize-uplift`
+(same-stack version bump — when the target is a newer version of the *same*
+stack, this is the path, not transform). For each phase:
- Scope (which legacy modules, which target services)
- Entry criteria (what must be true to start)
- Exit criteria (what tests/metrics prove it's done)
-- Estimated effort (person-weeks, derived from COCOMO + complexity data)
+- Relative scale (T-shirt size — S/M/L/XL — anchored to the phase's share
+ of the assessment's COCOMO complexity index. This ranks phases by size
+ against each other; it is **not** a duration. Do **not** state
+ person-months, weeks, calendar dates, or a delivery estimate — agentic
+ transformation does not follow the human-team productivity curves those
+ units assume, so any time figure here would be misleading.)
- Risk level + top 2 risks + mitigation
-Render the phases as a Mermaid `gantt` chart.
+Render the phases as a Mermaid `flowchart LR` showing **sequence and
+dependencies** (Phase 1 → Phase 2 → …, with branches where phases are
+independent). Do **not** use a `gantt` chart — gantt encodes calendar
+durations, and this plan deliberately makes no time claims.
+
+### 4. Business Walkthroughs
+For each persona flow in `analysis/$1/topology.json` (`flows` — produced
+by `/modernize-map`), a short narrative table: persona, what happens in
+business language, which legacy modules implement it today, and which
+phase from §3 replaces each. This is the section non-technical approvers
+actually read — it connects "Phase 2" to "what happens when a customer
+files a claim". If topology.json has no flows, derive 2–3 walkthroughs
+from the entry points and say they need SME confirmation.
-### 4. Behavior Contract
+### 5. Behavior Contract
List the **P0 rules** from BUSINESS_RULES.md (the ones tagged `Priority: P0` —
money, regulatory, data integrity) that MUST be proven equivalent before any
phase ships. These become the regression suite. Flag any P0 rule with
Confidence < High as a blocker requiring SME confirmation before its phase
starts.
-### 5. Validation Strategy
+### 6. Validation Strategy
State which combination applies: characterization tests, contract tests,
parallel-run / dual-execution diff, property-based tests, manual UAT.
Justify per phase.
-### 6. Open Questions
+### 7. Open Questions
Anything requiring human/SME decision before Phase 1 starts. Each as a
checkbox the approver must tick.
-### 7. Approval Block
+### 8. Approval Block
```
Approved by: ________________ Date: __________
Approval covers: Phase 1 only | Full plan
@@ -60,6 +91,7 @@ Approval covers: Phase 1 only | Full plan
## Present
-Enter **plan mode** and present a summary of the brief. Do NOT proceed to any
-transformation until the user explicitly approves. This gate is the
-human-in-the-loop control point.
+Present a summary of the brief and **stop — write nothing further until
+the user explicitly approves** (use plan mode if the session supports
+it). This gate is the human-in-the-loop control point; "no objection" is
+not approval.